SEG 6000
The SEG 6000 plays a crucial role in the production process of segments used in metro and tunnel construction. This system uses vacuum transport technology to extract the segment from the mold. After the 6-ton segment is removed from the mold, it is transferred to a specially designed rotating machine to be turned 180 degrees.
The segments produced for one of Turkey's largest projects, *Marmaray, were transported using the lifting and rotating machines provided by Arsan Vakum, and later sold to Japan's Taisei Corporation. Based on the user's satisfaction, our company also carried out production for subsequent projects.
SEG 6000 Vacuum Machine Technical Specifications:
- Capacity: 6 Tons
- Energy Cut Segment Holding Time: 15 Minutes
- Locking and Transport Features: Yes, ensures safe transportation of the segment.
- Safety Signals: Available, enhancing user safety.
- Easy and Safe Transport: Ensures high security and efficiency during segment transport.
Projects Where Arsan Vakum's Segment Lifting and Rotating Machines Were Used:
1. Japan Taisei Corporation / Marmaray Project
2. Mesa Ankara
3. Gülermak-Kolin-Kalyoncu / Mecidiyeköy - İkitelli Project
4. Akser Beton (Aga Enerji) / Bakırköy-Kirazlı Project
5. Akser Beton (Aga Enerji) / Ataköy-İkitelli Project
6. 3rd Airport Kemerburgaz / Kolin-Kalyon-Cengiz
7. 3rd Airport İhsaniye / Kolin-Kalyon-Cengiz
In these projects, the segment lifting and rotating machines provided by Arsan Vakum were effectively used, ensuring a safe and efficient construction process.